Wallbridge Continues To Intersect High Grade Mineralization With 49.06 g/t Gold Over 10.13 Metres

By Ashley Cowell

Wallbridge Mining Company Ltd. (TSX:WM, FWB:WC7) (“Wallbridge” or the “Company”) is pleased to announce continued positive results from its underground drill program and to provide an update on the ongoing development as part of the 35,000-tonne bulk sample and underground exploration program at its 100%-owned Fenelon Gold Property (“Fenelon”).

Highlights

  • To date, 50 drill holes have been completed totaling more than 4,800 metres.
  • Visible gold was observed to be present in 33 drill holes.
  • Since the last press release (see Wallbridge Press Release dated August 14, 2018), partial assay results of 6 additional holes have been received with highlights as follows:

    18-1035-005: 48.81 g/t gold over 6.13 metres in the Naga Viper zone

    18-1035-010: 30.47 g/t gold over 3.63 metres in the Chipotle zone

    18-1035-017: 49.06 g/t gold over 10.13 metres in the Chipotle zone

  • Assay results from additional 38 drill holes are pending.
  • The 18,000-metre drilling program from underground and surface is planned to continue until December 2018.
  • Blasting and mucking of the first stope (CH-01) is underway.
  • Production drilling of the second stope (NV-01) will begin next week.
  • Ramp development is nearing the second level (5180 Level).
  • Over 2,000 tonnes of ore has been shipped and stockpiled at the Camflo mill.

“The highlighted intersections released today further confirm the robust gold grades and thicknesses within parts of the Chipotle and Naga Viper zones that were selected for this bulk sample program. The drilling from the 0990-setup testing the West extension area has also produced excellent results so far. We are defining the western extent of the new high-grade shoot discovered in the Naga Viper zone last year and are intersecting similar quality mineralization in the Paprika and Habanero zones as well, which led us to add additional drill holes to follow the mineralization westward in these two zones. We are looking forward to releasing results from these drill holes as they become available,” stated Attila Péntek, Vice-President, Exploration of Wallbridge.

The bulk sample is expected to produce 19,000 to 26,000 ounces of gold with close to 50% of gold priced at $1,720 per ounce. The expected cash flow upon completion of this bulk sample, net of all bulk sample costs and including the financing costs is expected to be sufficient to cover the budgeted working capital requirements.

“We are very pleased with the progress made in advancing underground development in preparation for the remaining bulk sample stopes. The project team, along with our contractors, have worked tirelessly to deliver a safe and successful project and we continue to build upon this as we evaluate all opportunities to deliver additional value through our ongoing efforts in health & safety, productivity and cost improvements,” stated Frank Demers, Vice-President, Mining & Projects of Wallbridge.

The bulk sample program is designed to test a few stopes in several zones. Overall grade from these planned stopes is estimated to average 18 to 25 g/t gold. The geology team has developed an extensive sampling program to characterize the mineralized material during this bulk sample. Chip samples are collected from a sampling line across each development face and muck samples are also taken in a regular pattern on surface.

Drilling to date from the 5213 level has mainly targeted the Chipotle and Naga Viper zones in the upper 100 m, between levels 5150 and 5213. Stopes that have thus far been drilled-off to the planned 6 to 7 m nominal spacing have provided good confirmation of the geological model and continuity of the high-grade shoots. Drilling is now focusing on defining stopes and expanding resources in the West extension area of the Naga Viper and Habanero zones, including the high-grade shoot discovered last year with intersections that included 260.44 g/t gold over 7.02 metres, 141.16 g/t gold over 7.06 metres and 311.08 g/t gold over 3.06 metres (see Wallbridge Press Release dated December 13, 2017).

Deeper drilling to test the down-plunge of known high-grade shoots is planned for Q4 of 2018 once the lower levels are developed.

A 10,000 metre surface drilling program is also scheduled to start in September to follow known mineralized zones and expand resources at depth and further away from the mine workings.

A summary of the drill hole results from the underground drilling are reported in Tables 1 and 2 and also shown on Figures 1 to 7 below.

Table 1. Wallbridge Fenelon Gold Property 2018 Underground Drill Assay Highlights
Drill Hole From To From To Length True Width Au Au Capped* VG** Zone Press Release
(m) (m) (m) (m) (m) (m) (g/t) (g/t)
18-1030-006 27.79 30.20 2.41 2.20 15.91 15.91 VG Chipotle July 25, 2018
18-1030-006 Including… 28.50 29.11 0.61 0.56 59.10 59.10 VG Chipotle July 25, 2018
18-1030-007 31.26 32.66 1.40 1.08 16.72 16.72 VG Chipotle July 25, 2018
18-1030-008 34.47 38.06 3.59 2.76 9.27 9.27 VG Chipotle July 25, 2018
18-1030-008 Including… 35.03 36.61 1.58 1.22 17.37 17.37 VG Chipotle July 25, 2018
18-1030-009 77.58 81.00 3.42 2.70 35.91 35.91 VG Paprika July 25, 2018
18-1030-009 Including… 78.90 80.60 1.70 1.34 63.33 63.33 VG Paprika July 25, 2018
18-1030-009 90.00 90.97 0.97 0.75 4.76 4.76 Habanero July 25, 2018
18-1030-010 81.00 81.42 0.42 0.32 13.60 13.60 VG Naga Viper July 25, 2018
18-1030-011 80.10 85.50 5.40 4.37 10.05 10.05 Naga Viper Aug 14, 2018
18-1030-012 68.30 71.26 2.96 1.33 10.09 10.09 VG Chipotle 1 Aug 14, 2018
18-1030-012 79.42 82.50 3.08 1.39 7.32 7.32 VG Chipotle 2 Aug 14, 2018
18-1030-012 107.33 108.29 0.96 0.60 6.38 6.38 VG Paprika Aug 14, 2018
18-1035-002 49.20 54.00 4.80 3.26 29.23 28.35 VG Chipotle Aug 14, 2018
18-1035-002 Including… 49.97 52.95 2.98 2.03 46.30 44.89 VG Chipotle Aug 14, 2018
18-1035-003 52.20 52.77 0.57 0.39 5.60 5.60 VG Chipotle Aug 14, 2018
18-1035-004 24.94 26.02 1.08 0.73 65.70 65.70 VG Fresno Aug 14, 2018
18-1035-005 58.77 64.90 6.13 5.86 48.81 24.35 VG Naga Viper Current
Release
18-1035-005 78.65 79.31 0.66 0.53 26.90 26.90 Paprika Current
Release
18-1035-007 74.30 78.07 2.42 1.94 5.27 5.27 Paprika Current
Release
18-1035-007 84.90 85.50 0.60 0.48 15.60 15.60 Habanero Current
Release
18-1035-010 30.45 34.08 3.63 2.72 30.47 30.47 VG Chipotle Current
Release
18-1035-010 Including… 32.9 34.08 1.18 0.89 91.94 91.94 VG Chipotle Current
Release
18-1035-010 47.50 49.40 1.90 1.43 3.07 3.07 Anaheim Current
Release
18-1035-012 28.01 28.56 0.55 0.44 28.30 28.30 VG Chipotle Aug 14, 2018
18-1035-012 56.41 56.71 0.30 0.29 61.10 61.10 VG Naga Viper Aug 14, 2018
18-1035-015 63.00 65.05 2.05 1.11 6.63 6.63 VG Chipotle Current
Release
18-1035-016 66.77 67.50 0.73 0.51 5.73 5.73 Chipotle Current
Release
18-1035-016 98.17 100.00 1.83 1.24 4.26 4.26 Paprika Current
Release
18-1035-017 56.00 66.13 10.13 5.51 49.06 23.93 VG Chipotle Current
Release
*Au capped at 140 g/t following InnovExplo’s 2016 Mineral Resource Estimate.
**Intervals containing visible gold (“VG”).

<td …read more

From:: Investing News Network

Table 2. Fenelon Gold Property drill hole information
Drill Hole ID UTM E UTM N Elevation Length
(Metres)
Azimuth Dip VG* Note
18-1030-006 10566 10999 5213 71 205 -6 VG
18-1030-007 10566 10999 5213 54 211 -13 VG
18-1030-008 10566 10999 5213 80 203 -17 VG
18-1030-009 10566 10999 5213 95 204 -27 VG
18-1030-010 10566 10999 5213 100 205 -32 VG
18-1030-011 10566 10999 5213 115 205 -38
18-1030-012 10566 10999 5213 125 206 -45 VG
18-1035-002 10571 10997 5214 90 192 -29 VG
18-1035-003 10571 10997 5214 93 184 -28 VG
18-1035-004 10571 10997 5214 93 197 -24 VG Further Assays pending
18-1035-005 10571 10997 5214 90 191 -22 VG Further Assays pending
18-1035-006 10571 10997 5214 93 185 -22 Further Assays pending
18-1035-007 10571 10997 5214 85 184 -17
18-1035-008 10571 10997 5214 90 177 -18
18-1035-009 10571 10997 5214 96 170 -17
18-1035-010 10571 10997 5214 75