Barkerville Gold Mines (TSXV: BGM) is pleased to announce additional drilling results from the 50,000-meter 2018 Island Mountain exploration and delineation program at the company’s flagship Cariboo Gold project.
As quoted in the press release:
Recent highlights include high-grade intersections at Mosquito Creek Zone hole IM-18-102 that assayed 14.70 g/t Au over 23.60 meters, at a vertical depth of 120 meters. This intercept is 10 meters down dip from hole IM-17-100 that assayed 24.13 g/t Au over 12.70 meters. Recent high-grade intercepts at Shaft Zone on Island Mountain include 3,780 g/t Au over 0.70-meter-wide sample in hole IM-18-108 and 11.83 g/t Au over 17.50 meters in hole IM-18-113. Detailed drilling results are presented in the table below. A drill hole location plan map and vertical section are presented at the end of this release.
Click here for the full text release
The post BGM: Island Mountain Drilling Intersects New Vein Corridors at Mosquito Creek Zone appeared first on Investing News Network.
From:: Investing News Network