A suitable drilling contractor has been engaged at the Blyvoor gold joint venture (JV) and drilling is currently under way and on schedule at the project. The drilling programme is a key activity in the resource upgrade programme that forms part of the technical work required for the completion of the definitive feasibility study (DFS).