Manono DFS 95% complete

ASX-listed AVZ Minerals says the definitive feasibility study (DFS) into its Manono lithium and tin project, in the Democratic Republic of the Congo, is 95% complete, with the results to be released by March 31. It adds that transport studies to select the most suitable and cost effective method of transporting the Manono lithium products to port have also been completed.