Osisko Metals – More High Grade Results From Key Anacon
The news below was released today from Osisko Metals. The drill results from the Key Anacon Project are more high grade zinc and lead intercepts over 20 meters. We also get an update that the resource is expected in Q1 of this year. Read below for the full news release.
Also if you have any questions for the team at Osisko Metals please email me at Fleck@kereport.com. I will be chatting with Jeff Hussey in the later afternoon tomorrow.
Click here to visit the Osisko Metals website for more information on the Company.
Here’s the news…
MONTREAL, Feb. 07, 2019 — Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX-V: OM; FRANKFURT: OB5) is pleased to announce assay results from 10 drill holes from the Main Zone of its wholly owned Key Anacon project, located 20 km south of the city of Bathurst, New Brunswick.
Two drill holes targeted the core of the Main Zone in order to confirm historical drill results. Drill hole KAMZ-18-27intersected 20.70 metres of massive sulphides grading 7.92% zinc, 4.72% lead, 0.19% copper and 185.39 g/t silver (see Main Zone Longitudinal map and Table 1). Additionally, drill hole KAMZ-18-28 drilled 8.86 metres grading 9.13% zinc, 3.61% lead, 0.01% copper, and 132.87 g/t silver.
Table 1: Highlights of Significant Zinc-Lead and Copper intercepts; full details in Tables 2 and 3.
KEY ANACON MAIN ZONE – HIGHLIGHTS | ||||||||
Hole Name | From | To | Width | Zn | Pb | Cu | Ag | Zn+Pb |
(m) | (m) | (m) | % | % | % | g/t | % | |
KAMZ-18-24 | 483.00 | 488.00 | 5.00 | 4.22 | 1.17 | 0.04 | 48.98 | 5.39 |
KAMZ-18-27 | 197.00 | 202.6 | 5.60 | 1.30 | 0.17 | 1.75 | 25.72 | 1.47 |
KAMZ-18-27 | 204.10 | 214.10 | 10.00 | 4.22 | 0.83 | 0.44 | 35.98 | 5.05 |
KAMZ-18-27 | 253.40 | 274.10 | 20.70 | 7.92 | 4.72 | 0.19 | 185.39 | 12.64 |
KAMZ-18-28 | 398.60 | 407.46 | 8.86 | 9.13 | 3.61 | 0.01 | 132.87 | 12.74 |
Jeff Hussey, President and CEO of Osisko Metals, commented: “We are very pleased with the robust grade and continuity of the Main Zone. These drill results continue to demonstrate that the Key Anacon project is one of the best undeveloped assets in the Bathurst Camp. We are in the process of compiling the 22,000m of 2018 drill results in both the Main and Titan Zones. We look forward to releasing a NI43-101 Mineral Resource Estimate in the first quarter of 2019.”
About Key Anacon
The Key Anacon project is located approximately 20 km south of the town of Bathurst, New Brunswick and 16 km southeast of the former Brunswick No.12 mine. It is accessible by paved roads. The property contains two known Bathurst-type volcanogenic massive sulphide deposits containing zinc, lead, copper and silver. The Key Anacon Main Zone and Titan Zone deposits are situated at the same stratigraphic horizon that hosted the Brunswick No. 12 & No. 6 mines. The property covers approximately 12 kilometres of favorable Nepisiguit Falls stratigraphy that also extends onto the surrounding claims held 100% by Osisko Metals.
No mineral resource estimates have been calculated under NI43-101 guidelines. Except for exploration programs conducted in 1992-1993 and 2000, almost all of the drilling was completed in the 1950’s and 60’s, prior to currently required standards for quality assurance and quality control. The earlier drilling led to the establishment of a 460-metre-deep shaft, a ventilation raise, eight levels and three sub-levels at the Main Zone. The Government of New Brunswick, Department of Energy and Resource Development, Energy and Mines Division reports the Main Zone deposit as having a historical resource (Non-NI 43-101 compliant) of 1.87 million tonnes grading 6.93% Zn, 2.63% Pb, 0.16% Cu, and 84 g/t Ag (R. Irrinki, 1988, unpublished) in multiple folded lenses. The deposit is open at depth and along strike.
Exploration potential at Key Anacon and the Company’s adjacent properties is considered to be excellent on the basis of the presence of the Brunswick Horizon stratigraphy and the expansive zones of mineralization and alteration. Both the Titan Zone and Main Zone are open at depth and along strike. Exploration and development in the 1950’s and 1960’s were terminated due to the pullback of the zinc commodity price at that time. Since then, only two minor exploration programs were conducted by major mining companies.
Osisko Metals would like to thank the New Brunswick government for the financial grant awarded through the New Brunswick Junior Mining Assistance Program (NBJMAP). Through their continued support of the industry, Osisko Metals has used the grant for work at Key Anacon, to develop this premier asset in the Bathurst Mining Camp.
Table 2: Drill hole composite assay intervals.
Hole Name | From | To | Drilled Width |
True Width |
Zinc | Lead | Copper | Silver | Lead + Zinc |
(metres) | (metres) | (metres) | (metres) | % | % | % | g/t | % | |
KAMZ-18-18 | 155.00 | 179.00 | 24.00 | 4.17 | 0.75 | 0.24 | 0.01 | 2.34 | 0.99 |
KAMZ-18-20 | No significant assays | ||||||||
KAMZ-18-21 | 287.60 | 294.30 | 6.70 | 4.73 | 2.80 | 0.86 | 0.03 | 40.38 | 3.66 |
KAMZ-18-22 | 368.50 | 377.00 | 8.50 | 4.88 | 2.92 | 0.79 | 0.02 | 20.76 | 3.71 |
KAMZ-18-23 | 723.10 | 742.70 | 19.60 | 15.01 | 0.67 | 0.18 | 0.01 | 7.04 | 0.85 |
KAMZ-18-24 | 483.00 | 488.00 | 5.00 | 2.50 | 4.22 | 1.17 | 0.04 | 48.98 | 5.39 |
KAMZ-18-25 | 326.65 | 330.60 | 3.95 | 2.27 | 1.51 | 0.33 | 0.00 | 14.28 | 1.84 |
KAMZ-18-26 | 266.15 | 270.30 | 4.15 | 2.67 | 0.58 | 0.16 | 0.00 | 5.13 | 0.74 |
KAMZ-18-27 | 197.00 | 202.60 | 5.60 | 4.00 | 1.30 | 0.17 | 1.75 | 25.72 | 1.47 |
KAMZ-18-27 | 204.10 | 214.10 | 10.00 | 7.07 | 4.22 | 0.83 | 0.44 | 35.98 | 5.05 |
KAMZ-18-27 | 222.10 | 228.10 | 6.00 | 4.24 | 4.16 | 1.45 | 0.01 | 14.72 | 5.61 |
KAMZ-18-27 | 253.40 | 274.10 | 20.70 | 13.30 | 7.92 | 4.72 | 0.19 | 185.39 | 12.64 |
KAMZ-18-27 | 284.10 | 290.10 | 6.00 | 3.86 | 1.78 | 0.36 | 0.04 | 13.03 | 2.13 |
KAMZ-18-28 | 330.00 | 335.00 | 5.00 | 2.87 | 2.39 | 0.61 | 0.03 | 9.68 | 3.00 |
KAMZ-18-28 | 398.60 | 407.46 | 8.86 | 5.70 | 9.13 | 3.61 | 0.01 | 132.87 | 12.74 |
Note: Estimated True Widths are based on local geometry of mineralization adjacent to each drill hole.
Table 3: Drill hole information and location in New Brunswick Double Stereographic Projection (NBS).
Hole Name | Easting | Northing | Elevation | Azimuth | Dip | Depth (metres) |
KAMZ-18-18 | 2,560,287 | 7,604,666 | 62 | 245 | -70 | 389 |
KAMZ-18-20 | 2,560,267 | 7,604,707 | 61 | 246 | -58 | 296 |
KAMZ-18-21 | 2,560,660 | 7,603,897 | 64 | 51 | -58 | 365 |
KAMZ-18-22 | 2,560,660 | 7,603,897 | 64 | 53 | -66 | 419 |
KAMZ-18-23 | 2,560,245 | 7,603,979 | 57 | 53 | -55 | 798 |
KAMZ-18-24 | 2,560,659 | 7,603,897 | 64 | 56 | -74 | 535 |
KAMZ-18-25 | 2,560,631 | 7,603,958 | 64 | 47 | -66 | 377 |
KAMZ-18-26 | 2,560,631 | 7,603,958 | 64 | 47 | -58 | 302 |
KAMZ-18-27 | 2,560,403 | 7,604,212 | 63 | 41 | -54 | 401 |
KAMZ-18-28 | 2,560,497 | 7,604,134 | 62 | 57 | -65 | 510 |
Note regarding historical resource and Qualified Person
The above-mentioned historical resources do not conform to National Instrument 43-101 standards. The Company is reporting the historical estimates for reference purposes only. Neither Osisko Metals nor its consultants have completed sufficient work to verify the historical estimates and these should not be relied upon for investment purposes. A Qualified Person has not done sufficient work to classify the historical estimates as NI43-101 compliant mineral resources and there is no guarantee that such work will allow conversion of such historical resources.
Mr. Charles Kodors is the Qualified Person responsible for the technical data reported in this news release. He is a Professional Geologist registered in New Brunswick and is the Exploration Manager for the Bathurst Mining Camp for Osisko Metals Incorporated.
Quality Assurance / Quality Control
Osisko Metals adheres to a strict Quality Assurance and Quality Control program with regard to core handling, sampling, transportation of samples and lab analyses. Drill core from Osisko Metals Bathurst Camp projects is securely transported to its core facility in Bathurst, NB where it is logged and sampled. Samples selected for assay were shipped via secure transportation to the Actlabs preparation facility in Fredericton, NB. Pulps were analyzed at Actlabs facility in Ancaster Ontario. Zinc, lead and copper were analyzed by assay grade peroxide fusion (total digestion) with ICP-AES finish. Silver was analyzed by gravimetric fire assay and gold by fire assay-atomic absorption.
About Osisko Metals
Osisko Metals is a Canadian exploration and development company creating value in the base metal space with a focus on zinc mineral assets. The Company controls Canada’s two premier zinc mining camps. The Company’s flagship, the Pine Point Mining Camp (“PPMC”), located in the Northwest Territories, has an Inferred Mineral Resource of 38.4 Mt grading 4.58% zinc and 1.85% lead, making it the largest high grade, pit constrained zinc deposit in Canada (please refer to the Amended Technical Report for further information). Within the Bathurst Mining Camp (“BMC”), located in northern New Brunswick, the Company is focused on drilling and developing the Key Anacon Project, which previously had only sporadic exploration work since the 1960’s. In 2019, the Company will continue to diligently develop and explore in order to confirm and grow both projects. In Québec, the Company owns 42,000 hectares that cover 12 grass-root zinc targets that will be selectively advanced through exploration.
For further information on Osisko Metals, visit www.osiskometals.com or contact: | |
Jeff Hussey President & CEO Osisko Metals Incorporated (514) 861-4441 Email: info@osiskometals.com www.osiskometals.com |
Christina Lalli Director, Investor Relations Osisko Metals Incorporated (438) 399-8665 Email: clalli@osiskometals.com www.osiskometals.com |
Cautionary Note Regarding Forward-Looking Information
This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the use of proceeds of the Offering; the timing and ability of the Corporation, if at all, to obtain final approval of the Offering from the TSX Venture Exchange; an exemption being available under MI 61-101 and Policy 5.9 of the TSX Venture Exchange from the minority shareholder approval and valuation requirements for each related party transaction; objectives, goals or future plans; statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary nature of metallurgical test results; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the Corporation’s public documents filed on SEDAR at www.sedar.com. Although the Corporation believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.