Dual-listed Euro Manganese has announced the results of the preliminary economic assessment (PEA) of its Chvaletice manganese project, in Czech Republic, which shows the tailings project can operate for a quarter of a century, producing 1.19-million tonnes of high-purity electrolytic manganese metal (HPEMM).
Two thirds of the HPEMM is expected to be converted into high-purity manganese sulphate monohydrate power (HPMSM).