Japan

World’s top uranium miner Cameco swings to loss in first quarter

The uranium producerlogged a C$18.3 million loss in the first quarter of 2019, compared with a profit of C$57.8 million a year ago. That’s equivalent to a decrease of five cents per share, versus a profit of 14 cents per share in the same quarter last year.

The post World’s top uranium miner Cameco swings to loss in first quarter appeared first on MINING.com.

World’s top uranium miner Cameco swings to loss in first quarter Read More »

Japanese owner of Chile’s Caserones copper mine said to be mulling sale

Asked about it, however, JX Nippon Mining — the metal unit of JXTG Holdings — declined to comment, adding it was not something that has already been decided.

The post Japanese owner of Chile’s Caserones copper mine said to be mulling sale appeared first on MINING.com.

Japanese owner of Chile’s Caserones copper mine said to be mulling sale Read More »

Orocobre and Toyota Tsusho green light first lithium hydroxide plant in Japan

The majority of production will feed the Japanese battery industry and will be sourced from the lithium carbonate produced from Orocobre’s Olaroz mine in Argentina.

The post Orocobre and Toyota Tsusho green light first lithium hydroxide plant in Japan appeared first on MINING.com.

Orocobre and Toyota Tsusho green light first lithium hydroxide plant in Japan Read More »

Japan’s Mitsui injects $30m into Sigma’s lithium project in Brazil

The Japanese trading house is backing Sigma’s Grota do Cirilo hard rock lithium project, in the south-eastern province of Minas Gerais.

The post Japan’s Mitsui injects $30m into Sigma’s lithium project in Brazil appeared first on MINING.com.

Japan’s Mitsui injects $30m into Sigma’s lithium project in Brazil Read More »

World’s top uranium miner Cameco in no hurry to resume production

The company says it has seen a significant improvement over the past year, with prices up about 20%, but believes conditions are not where they need to be to restart idled capacity.

The post World’s top uranium miner Cameco in no hurry to resume production appeared first on MINING.com.

World’s top uranium miner Cameco in no hurry to resume production Read More »

IAMGOLD puts construction of Canadian mine on ice

Building activities at Côté Gold, located in the Abitibi gold belt in Ontario, were slated to start in the first months of 2019, with pre-production beginning in late 2020.

The post IAMGOLD puts construction of Canadian mine on ice appeared first on MINING.com.

IAMGOLD puts construction of Canadian mine on ice Read More »