The results of Trevali Mining’s pre-feasibility on an expansion of the Rosh Pinah zinc-lead-silver underground mine in Namibia, to 1.3 million tonnes per year, up from 700,000 tonnes per year currently, suggest potential for increased production, at lower operating costs,…
The post Trevali weighs Rosh Pinah expansion with strong pre-feasibility returns appeared first on Canadian Mining Journal.