QUEBEC – Iamgold has reported results from its 2020 drill program at the Rouyn project, near Rouyn-Noranda, including a 9.8-metre interval of 27.8 g/t gold starting at 195 metres downhole. The star intercept, which was drilled in the Lac Gamble…
The post GOLD: Iamgold cuts 9.8 metres of 27.8 g/t gold at Rouyn project appeared first on Canadian Mining Journal.