An economic study into the Oropesa tin project, in Spain, has found that the project could produce some 2 440 t/y of tin metal over a mine life of 14 years.
The study was based on the development of an opencut mine, processing plant, tailings storage facility and infrastructure to support a 750 000 t/y mining operation.