ONTARIO – Treasury Metals has reported the results of three holes completed within the Main zone of the deposit at its 50-sq.-km Goliath gold project. The drill highlights include 19.5 metres of 6.3 g/t gold, 9 metres of 4.8 g/t…
The post GOLD: Treasury drills high grades at Goliath Main zone appeared first on Canadian Mining Journal.