COPPER-GOLD: BTU continues to hit VMS-style mineralization at Dixie Halo

RED LAKE – Drilling at BTU Metals’ 197-sq.-km Dixie Halo project returned continuous volcanogenic massive sulphide-style mineralization over 300 metres, starting at surface, with metal grades increasing with depth. Hole BTU-19-25 reported in the most recent release includes a 173-metre

The post COPPER-GOLD: BTU continues to hit VMS-style mineralization at Dixie Halo appeared first on Canadian Mining Journal.