The Carrapateena copper/gold mine in South Australia, has reached nameplate mill throughput rates, with stable operational periods at 500 t/h and in excess of 90% runtime achieved for a 24-hour period.
ASX-listed Oz Minerals on Wednesday said that flotation recovery for several shifts have also exceeded 90%, with concentrate grades in excess of 40% copper.