Gold miner Gold Road Resources has set a production target of between 250 000 oz and 285 000 oz for the Gruyere joint venture (JV), in Western Australia, for 2020.
The gold miner on Wednesday noted that drilling at the Gruyere JV in 2019 resulted in a 1.23-million ounce increase to the measured and indicated resource, which now stands at 6.1-million ounces, with the total mineral resource standing at 154-million tonnes, grading 1.34 g/t gold for 6.6-million ounces of contained gold, after mining depletion.