Torex says 2020 production will generate strong cash flow

Canadian intermediate gold producer Torex Gold Resources expects to produce between 420 000 and 480 000 oz of gold in 2020, with the mid-point of guidance relatively in line with the 454 810 oz of gold produced in 2019. Total cash costs are expected to range between $640/oz and $670/oz of gold sold. All-in sustaining cost are anticipated to range between $900/oz and $960/oz of gold sold.