‘Technical’ year ahead for Central Asia Metals as it moves to cut, fill mining

Aim-listed Central Asia Metals (CAML) managed to exceed its yearly guidance at the Kounrad copper recovery plant, in Kazakhstan, producing 13 771 t in 2019.

This while production at the Sasa mine, in north Macedonia, reached the top end of the guidance range at 23 360 t zinc and 29 201 t lead.