BURKINA FASO – A feasibility study has found that increasing the carbon-in-leach (CIL) plant capacity and postponing the heap leach operation to the end of the mine life is more economical than operating both a heap leach and the CIL…
The post GOLD: Iamgold study expands Essakane mine appeared first on Canadian Mining Journal.