Baita Plai refinancing at ‘advanced stage’ – Vast

The Baita Plai polymetallic operation, in Romania, could be in operation within three months from the drawdown of financing, owner Vast Resources reported on Monday, noting that the refinancing of the mine had reached an “advanced stage”.

It has been a long road for Vast to bring Baita Plai –1.8-million-tonne copper/silver/zinc/lead/gold/tungsten/molybdenum ore body – into operation.