Niger has formally approved a revision to the shape of the Madaouela 1 mining permit that forms part of dual-listed GoviEx Uranium’s flagship Madaouela uranium project. The revision includes the additional 5.96-million pounds of uranium oxide (U3O8) in the measured and indicated categories associated with the Miriam uranium deposit, as well as the 17.88-million pounds of U3O8 in the measured and indicated categories associated with the Madaouela South North East (MSNE) deposit, both previously situated within the Agaliouk exploration permit.