Uranium project developer Denison Mines has started installing higher cost, larger diameter commercial scale wells as part of the insitu recovery (ISR) field test programme at its Wheeler River uranium project, in northern Saskatchewan.
The commercial-scale wells form part of the second stage of ISR field testing at the Phoenix deposit. It follows positive results from initial field tests, which have confirmed hydraulic connectivity within a significant portion of the ore zone tested.