Engineering and construction group Murray & Roberts (M&R) has added a further R10-billion to its order book, which stood at R46.8-billion at the end of July, and CEO Henry Laas believes the backlog could rise even further in the months ahead. At the end of July 2018, the group’s order book stood at R30.1-billion.