Kingsrose sets production targets, and paves way forward

Gold miner Kingsrose Mining has set a production target of between 9 500 oz and 11 000 oz for the six months to December, after both mining and processing operations resumed at its Way Linggo operation, in Indonesia.

The guidance for the half-year ended December compared with the 18 815 oz of gold produced in the half-year to June.