Rouyn project continues to deliver for Iamgold, Yorbeau

Toronto’s Iamgold  (TSE: IMG) and Montreal’s Yorbeau Resources (TSE: YRB) jointly released the results of the recent winter drilling program at the Rouyn gold project 4 km south of Rouyn-Noranda in Quebec. The results are from the Gamble Lake zone, between the Augmito and Astoria deposits.

Highlights include:

  • Hole GA-19-711: 9.7 metres grading 6.6 g/t gold, including 5.9 metres at 10.0 g/t;
  • Hole GA-19-719: 16.9 metres grading 3.4 g/t gold, including 5.8 metres at 5.7 g/t, including 1.8 metres at 10.3 g/t;
  • Hole GA-19-721: 23.4 metres grading 6.1 g/t gold, including 8.1 metres at 13.3 g/t, including 1.0 metre at 65.5 g/t; and
  • Hole GA-19-722: 10.1 metres grading 6.6 g/t gold, including 3.0 metres at 10.9 g/t and including 4.0 metres at 7.9 g/t.

Iamgold conducted the winter drilling to infill a part of the Lac Gamble zone drilled earlier by Yorbeau’s other partners. All the completed holes intersected the Cadillac-Piche corridor, as planned.

The results of the Gamble Lake drilling will be integrated with the existing geological, geochemical and structural information as a preliminary deposit model is created. Drilling has also resumed on selected targets near the historic Astoria deposit.

Iamgold can acquire 100% of the Royun project by paying C$4 million to Yorbeau and spending C$9 million on exploration over the next five years.

(This article first appeared in the Canadian Mining Journal)