Resolute beats full-year expectations

Gold miner Resolute Mining has exceeded both its production and cost guidance for the full-year ended June, despite production in the June quarter falling.

Gold production in the three months to June decreased to 78 132 oz, compared with the 98 105 oz poured in the previous quarter, with gold production at the Syama operation, in Mali, falling from the 84 551 oz produced in the March quarter, to 65 757 oz.