Lomiko Metals Inc. (TSXV:LMR) today released drill results from the remaining 16 holes at the Refractory zone of the La Loutre graphite project in Québec. A total of 21 holes have been completed at the zone, for a total of 2,985 metres. La Loutre is 80% owned by Lomiko, while Quebec Precious Metals Corporation (TSXV:CJC) owns the rest of the project.
Shares of Lomiko Metals went up by 12.5% on Tuesday. The company’s market cap currently stands at approximately C$3.4 million.
The drill results released today include multiple intercepts over 100 metres or exceeding 10% Cg (carbon flake graphite), highlighted by 18.85% Cg over 7.5 m, 9.89% Cg over 103.5 m, 4.93% Cg over 111.0 m and 12.38% Cg over 16.3 m.
Based on a technical report released in march 2016, La Loutre contains an estimated mineral resource of 18.4 million tonnes at 3.19% Cg in the indicated category and 16.7 million tonnes at 3.75% Cg in the inferred category. The project is located about 53 km away from Imerys Graphite & Carbon’s mine in Lac-des-Îles — the only operating graphite mine in North America.
Lomiko plans to follow up on today’s results by completing a new resource estimate for the entire project, including the 36 new holes completed since the 2016 report.