A prefeasibility study (PFS) into the Vittangi graphite project, in Sweden, has estimated that it could support a mine life of some 22 years.
ASX-listed Talga Resources on Thursday reported that the PFS, based on an on an ore reserve of 1.9-million tonnes, grading 23.5% total graphite content, could produce some 19 000 t/y of Talnode-C product, a fully engineered and coated lithium-ion graphite battery anode product, through an integrated concentrator and refinery.