Tando’s SPD proves viable

A scoping study into ASX-listed Tando Resources’ Phase 1 SPD vanadium project, in South Africa, has demonstrated that the project is technically and financially viable.

The Phase 1 project is based on a 2.2-million tonne a year stand-alone operation, which is expected to produce an average of 0.79-million tonnes a year of vanadium concentrate, over a 25-year mine life.