Lingering policy uncertainty and regulatory delays are continuing to impede the development of hundreds of small-scale embedded generation (SSEG) projects, which are seen at the quickest and cheapest way for South Africa to address its current electricity supply deficit. The South African Independent Power Producer Association (SAIPPA) estimates that between 2 500 MW to 3 500 MW of capacity is being constrained as a result of the problem and that 30 MW to 50 MW could be added monthly once coherent processes are instituted.