Basic engineering, design completion on Kamoa-Kakula project anticipated for mid-2019 – DRA

Engineering management group DRA Global’s basic engineering services contract on the Kakula mine portion of the greater Kamoa-Kakula copper project, in the Democratic Republic of Congo (DRC), is progressing well and is anticipated to be complete by mid-2019.

The mine is being developed by Kamoa Copper – a joint venture between Ivanhoe Mines, Zijin Mining Group and the DRC government.