Goldplat swings to H1 operating loss as operations deliver lower output

Aim-listed Goldplat reported an operating loss of £653 000 for the six months ended December 31, 2018, compared with an operating profit of £1.5-million for the six months ended December 31, 2017.

Production of gold and gold equivalents during the reporting period was 15 786 oz, compared with 20 246 oz in the prior comparable period, which was below the yearly forecast.