Barrick’s Loulo gold mine going solar

As part of its cost-reduction me and drive to manage its carbon footprint, the Loulo-Gounkoto gold mine is to install a 24 MW off-grid solar hybrid plant to support its existing 63 MW thermal power station, by harnessing Mali’s abundant solar resource. The 24MW off-grid solar plant has the potential of saving ten-million litres of fuel a year while reducing Loulo’s annual carbon emissions by 42 000 t.