Central Asia Metals meets production guidance for 2018

Aim-listed Central Asia Metals (CAM) met its 2018 production guidance for copper, zinc and lead at the Kounrad dump leach, solvent extraction and electrowinning copper recovery plant, in Kazakhstan, as well as at the Sasa zinc/lead mine, in Macedonia. Kounrad produced 14 049 t of copper in 2018, while Sasa delivered 22 532 t of zinc in concentrate and 29 388 t of lead in concentrate.